You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Issues relating the the confusing nature of one event, and a couple mechanical bugs.
Branch :
Main
Issue List :
**~ The economic success of the southern provinces**
Their are two nearly identical names for the top two entries and no explanation as to their function. But their costs differ.
**~ The Improve Trade Port focus**
This focus can be started, but one day after it starts running it will cancel. It appears to be related to an tag called "Generic Construction II". I don't know what it is or what causes it.
This even happens after the notification that "Generic Construction II" has ended.
**~ Develop Brazilian Homeland**
It adds something called Economic Debt. But I am unable to find out where economic debt is tracked, or what it does.
~Infrastructure Projects
They seem to function, but they are very confusing. I only figured out how they worked after failing an entire batch and wasting 5 years. They could do with a longer text description of even a tutorial section in the in-game wiki. They are from "Coffee Economy."
The text was updated successfully, but these errors were encountered:
Description :
Issues relating the the confusing nature of one event, and a couple mechanical bugs.
Branch :
Main
Issue List :
**~ The economic success of the southern provinces**

Their are two nearly identical names for the top two entries and no explanation as to their function. But their costs differ.
**~ The Improve Trade Port focus**
This focus can be started, but one day after it starts running it will cancel. It appears to be related to an tag called "Generic Construction II". I don't know what it is or what causes it.
This even happens after the notification that "Generic Construction II" has ended.
**~ Develop Brazilian Homeland**
It adds something called Economic Debt. But I am unable to find out where economic debt is tracked, or what it does.
~Infrastructure Projects
They seem to function, but they are very confusing. I only figured out how they worked after failing an entire batch and wasting 5 years. They could do with a longer text description of even a tutorial section in the in-game wiki. They are from "Coffee Economy."
The text was updated successfully, but these errors were encountered: