Skip to content

chore: add proper package manager #2

chore: add proper package manager

chore: add proper package manager #2

Triggered via push February 18, 2026 22:54
Status Failure
Total duration 28s
Artifacts

ci.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.8)
Process completed with exit code 1.
build (3.9)
The strategy configuration was canceled because "build._3_8" failed
build (3.9)
Process completed with exit code 1.
build (3.11)
The strategy configuration was canceled because "build._3_8" failed
build (3.11)
The operation was canceled.
build (3.10)
The strategy configuration was canceled because "build._3_8" failed
build (3.10)
The operation was canceled.