- Started structured parity review between the property and vehicle platforms.
- Loaded
brainstormingandplanning-with-filesskills. - Captured root-level structure of both repositories.
- Created planning files to track comparison findings and next steps.
- Read core manifests and README files for both projects.
- Confirmed the property platform is substantially broader in architecture and operational completeness than the current vehicle platform.
- Reviewed the user-provided Supabase instructions against the current stack.
- Confirmed those instructions target Next.js and do not fit this Vite + FastAPI codebase directly.
- Decomposed the full-parity request into four implementation workstreams.
- Chose data platform core as the recommended first sub-project because it sets the contract for pipeline, ops, and frontend work.
- Completed Phase 4 by documenting a parity gap matrix and upgrade path in
docs/parity-gap-analysis.md. - Updated planning files to mark Phase 4 complete and Phase 5 active.
- Began autonomous execution mode with mandatory per-phase verification and commit/push checkpoints.
- Completed Phase 5 by documenting phase-by-phase implementation sequence and acceptance gates in
docs/parity-execution-sequence.md. - Advanced the plan to Phase 6 implementation.
- Completed Phase 6 data-core implementation by replacing average-as-median logic in
CarPriceAggregatorwith listing-level median/p25/p75 calculations. - Added and ran red/green tests in
backend/tests/test_aggregator_percentiles.py. - Verified full backend suite:
22 passed. - Completed Phase 7 ingestion parity by introducing source alias canonicalization and applying it to both sync runners.
- Added
backend/tests/test_source_aliases.pyand re-verified backend suite:25 passed. - Completed Phase 8 scheduler/ops parity by adding pipeline run history and trigger endpoints.
- Added
backend/tests/test_pipeline_ops.pyand re-verified backend suite:28 passed. - Completed Phase 9 frontend parity by adding dashboard operations controls and pipeline run-history visibility.
- Added
src/test/pipelineOpsApi.test.ts, updated dashboard runtime mocks, and verified frontend suite:36 passed. - Verified production frontend build succeeded with
npm run build.
- Completed Ardeno alignment checkpoints through Phase 5 with per-phase commit and push on
main. - Completed Phase 6 release verification gate and documented command outcomes in
docs/ardeno-alignment-phase-6-verification.md. - Verified backend full suite (
pytest backend/tests -q), frontend full suite (npm run test,EXIT:0), lint (0 errors), and production build (vite buildsuccess). - Packaged deferred work as Phase 7 backlog epics with effort/risk labeling and rollout order in
docs/ardeno-alignment-phase-7-backlog.md.