You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Extend formulation to include an operation variable that enables flexible operation based on installed capacity.
Assumptions:
Each process has exactly one reference flow
The inventory of each process can be temporally classified in Construction, Operation and Decomission where Construction and Decommission Inventory is dependent on installed capacity
Inventory during operation is fixed in relation to the reference flow and proportional to amount of reference flow produced
The text was updated successfully, but these errors were encountered:
JanTautorus
changed the title
Dedicated differntitation between capacity installment and design
Dedicated differentiation between capacity installment and design
Mar 4, 2025
JanTautorus
changed the title
Dedicated differentiation between capacity installment and design
Dedicated differentiation between capacity installment and actual operation
Mar 4, 2025
Extend formulation to include an operation variable that enables flexible operation based on installed capacity.
Assumptions:
The text was updated successfully, but these errors were encountered: