Skip to content

Latest commit

 

History

History
16 lines (14 loc) · 621 Bytes

Disaster_Recovery_RPO_TRO.md

File metadata and controls

16 lines (14 loc) · 621 Bytes

Disaster Recovery: RPO and RTO

  • Return to table of contents

  • Exam Tips:

    • Recovery Point Objective (RPO):
      • The time between when a failure occurred and the last successful (recoverable) copy of necessary business data.
      • Goal is to minimize this length of time.
      • The business will help determine this time.
    • Recovery Time Objective (RTO):
      • The time between occurrence of a disaster and business required systems are operational again.
    • Improve this by decreasing restore time:
      • Hot Spares
      • Processes:
        • Game days
        • Run books