Skip to content

Flywheel Stage-3 gate reading due 2026-07-17 #149

Description

@bejranonda

The flywheel-repair spec gates Stage 3 on the loop-health panel over a rolling 2 weeks: ≥60% of sessions closed-with-learnings AND ≥40% injection→used. The used-rate signal accrues from v1.13.0 (2026-07-03), so 2026-07-17 is the first honest full window.

Baseline (2026-07-07, read-only SQL against prod):

  • 14-day window: 17 opened / 16 closed / 10 with learnings (59%) / used 4 (24%, polluted by pre-v1.13.0 sessions)
  • Honest window since v1.13.0: 4 opened / 3 with learnings (75%) / 4 injected / 3 used (75%) — both metrics above gate, small n
  • Duplicate project identities: 0 · Knowledge: 152 active, 58 with outcomes (38%)

How to read the gate on/after 2026-07-17: dashboard → Show everything → Loop health, or the read-only SQL in this issue's provenance (any agent session in the BrainPlatform checkout can run it — ask it to 'read the Stage-3 gate').

If the gate passes: (1) shrink MEMORY.md/file memory to bootstrap stubs (spec §5), (2) run the generation-uplift benchmark #126, (3) then pool widening #146. If it fails: diagnose which half starved — do not proceed anyway (spec §5).

Baseline note: the Brain-first protocol + Stop-hook were installed in Dementia-Daily / Nutri-Vision-AI / Start-Idea on 2026-07-07; sessions in those repos feed the same gate.

Metadata

Metadata

Assignees

No one assigned

    Labels

    enhancementNew feature or request

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions