OverSync v2 — Mainnet Readiness Scorecard

Mainnet (VITE_MAINNET_ENABLED=true) remains disabled until every gate below reaches Green. This is enforced at the code level (the frontend network-mode hook hard-rejects the mainnet path) and documented in docs/DEPLOYMENT.md. No launch date is promised in this document; dates below are targets that depend on audit scheduling and finding-severity outcomes.

Update this file whenever gate status changes. Every change must link to the on-chain transaction, audit report URL, or CI run that produced the evidence.


Status legend

Colour Meaning
Green Criterion fully met; evidence link present
Yellow Partially met or in-progress; specific gap described
Red Not started or explicitly blocked

Gate 1 — Audit status

Criterion. Both in-scope contracts are independently audited, all Medium-or-higher findings are remediated, and the public audit reports are committed to this repository.

Sub-criterion Status Evidence / blocker
HTLCEscrow.sol + ResolverRegistry.sol audited by an independent firm Red No audit engaged yet. Prerequisite: Q3 Foundry fuzz suite complete (see ROADMAP.md §Q3).
oversync-htlc + oversync-resolver-registry (Soroban) audited by an independent firm Red Same prerequisite. Soroban-specific audit capacity is limited; firm shortlist not yet finalised.
All Medium+ findings remediated; remediation diff linked in repo Red Depends on audits above.
Public audit reports committed under docs/audits/ Red Depends on audits above.
EVM differential test (e2e/cross-chain.test.ts) passing in CI Yellow Harness exists (e2e/cross-chain.test.ts); differential hashlock parity test not yet wired in CI (see SECURITY.md audit checklist).

Green definition. Two public audit reports in docs/audits/, zero open Medium+ findings, differential test green in CI.

Yellow definition. One audit complete, one in progress, or all findings are Low/Informational.

Red definition. No audits complete, or any open Medium+ finding without a merged remediation.

Current status: Red.


Gate 2 — Testnet uptime and swap count

Criterion. The v2 testnet stack (coordinator + reference resolver + contracts) sustains a continuous 14-day window with measurable swap throughput and no coordinator-caused fund-loss events.

Sub-criterion Status Evidence / blocker
Coordinator hosted and publicly reachable Green Hosted on Render; source at coordinator/.
Soroban HTLC deployed on Stellar testnet Green CDIKSJKVMXKGBRD3BBEBMF7Q4GQJ52ECU6R6G5HEKXKXVGGWK2CTA6JK
HTLCEscrow deployed on Sepolia Green 0xb352339BEb146f2699d28D736700B953988bB178
14-day continuous testnet run with ≥ $1k equivalent TVL and zero incidents Red Soak test planned for Q3 2026 (ROADMAP.md §Q3). Harness exists at e2e/load-test/; requires live executor.
Public testnet metrics dashboard (orders, refunds, latency) Yellow Prometheus + Grafana stack is a Q3 milestone; coordinator/ops/ not yet published publicly.

Green definition. 14 consecutive days without a coordinator-caused incident, metrics dashboard publicly accessible, TVL ≥ $1k sustained.

Yellow definition. Testnet live and processing swaps but < 14 days continuous or no public dashboard.

Red definition. Testnet not live, or a coordinator-caused fund-loss event recorded in the soak window.

Current status: Yellow — testnet contracts and coordinator are live, but the 14-day soak run has not yet been executed.


Gate 3 — Refund success

Criterion. All four refund layers work correctly under adversarial conditions, demonstrated by automated tests and a clean soak window.

Sub-criterion Status Evidence / blocker
On-chain refundOrder callable by anyone after timelock Green Covered in Hardhat test suite (test/v2/HTLCEscrow.test.ts) and Soroban tests (soroban/contracts/htlc/); CI-gated.
Frontend refund dialog triggers correct on-chain call Green frontend/src/features/refund/RefundDialog.tsx; covered in frontend unit tests.
Automatic XLM refund on ETH-leg failure Green relayer/src/xlm-refund.ts.
Background watchdog refunds XLM→ETH swaps pending > 5 min Green relayer/src/refund-watchdog.ts; 60-second scan interval.
Refund success rate ≥ 99% over 14-day soak window Red Metric not yet collected; depends on Gate 2 soak run.
Mean refund time ≤ timelock + 30 min (coordinator SLO from TRACTION.md §6) Red No live data yet; depends on soak run.

Green definition. All four refund layers pass automated tests, AND soak-window data shows ≥ 99% refund success rate with mean refund time within SLO.

Yellow definition. All four layers pass tests but no live soak data yet.

Red definition. Any refund layer failing its automated test, or soak data showing < 99% refund success.

Current status: Yellow — all four layers implemented and unit-tested; live soak data pending.


Gate 4 — Resolver participation

Criterion. At least three independent community resolvers are actively staked and filling orders before mainnet launch.

Sub-criterion Status Evidence / blocker
Open resolver runner published and documented Green resolver/ Docker image + docs/RESOLVERS.md.
ResolverRegistry accepting stake registrations on testnet Green 0x7D9ce70Aa40E144E8BbE266a0dc3b3F91B6D1D99
≥ 3 distinct community resolver addresses staked on testnet Red Currently only the reference resolver is operational. Partner outreach in progress (see docs/PARTNER_MAP.md).
≥ 3 resolvers active on mainnet for ≥ 30 days before public launch Red Depends on testnet participation first.
Resolver coldstart bootstrap grant pool approved Red Flagged as a Tranche 2 funding ask; not yet approved (see docs/REVIEW_RESPONSE.md).

Green definition. ≥ 3 independent resolver addresses with active stake on the mainnet ResolverRegistry, each having filled at least one order in the preceding 30 days.

Yellow definition. ≥ 1 community resolver active on testnet; mainnet onboarding not yet started.

Red definition. Only the reference resolver is operational; no community resolvers have staked.

Current status: Red.


Gate 5 — Observability

Criterion. Production coordinator exposes metrics that let operators and users independently verify bridge health.

Sub-criterion Status Evidence / blocker
Coordinator /metrics Prometheus endpoint Yellow Prometheus + Grafana stack is a Q3 2026 milestone; endpoint structure defined but not yet deployed publicly (ROADMAP.md §Q3).
Public Grafana (or equivalent) dashboard for TVL, volume, latency, refund rate Red Planned under coordinator/ops/ Docker Compose; not yet live.
Coordinator behind CDN / WAF with rate-limiting Red Reference deployment (Render) lacks WAF; production hardening is a mainnet-launch prerequisite per DEPLOYMENT.md.
p50 / p95 swap settlement latency published and meeting SLO Red No live data.
Coordinator Postgres migration path (replaces SQLite for production scale) Red Planned for Q3 2026 (ROADMAP.md §Q3).

Green definition. /metrics endpoint live, public dashboard accessible, coordinator behind CDN/WAF, p50/p95 latencies published and within SLO.

Yellow definition. Metrics endpoint exists but dashboard not public, or CDN not yet in place.

Red definition. No metrics endpoint, no dashboard, coordinator exposed directly to internet without rate-limiting.

Current status: Red.


Gate 6 — Bug bounty

Criterion. A public bug bounty programme is live before mainnet contracts are deployed, giving security researchers time to review with financial incentive.

Sub-criterion Status Evidence / blocker
Bug bounty platform selected (Immunefi or equivalent) Red Not yet contacted (TRACTION.md §4).
Bounty scope and reward tiers published Red Depends on audit completion (Gate 1); scope is defined post-audit.
Bounty programme live ≥ 14 days before mainnet activation Red Timing constraint; cannot be met until Gate 1 and Gate 5 are Green.
Responsible disclosure contact (security@oversync.app) published Green Documented in SECURITY.md; 48h acknowledgement committed.

Green definition. Bounty programme live on Immunefi (or equivalent) with published scope and reward tiers, open for at least 14 days without a critical report, and no outstanding critical findings.

Yellow definition. Platform selected and terms drafted; not yet publicly live.

Red definition. No bounty programme planned or contact for responsible disclosure not published.

Current status: Red — responsible disclosure contact is published; formal bounty programme not yet opened.


Gate 7 — Governance / multisig

Criterion. Privileged on-chain roles are transferred from the deploying EOA to a multisig before any mainnet funds are accepted.

Sub-criterion Status Evidence / blocker
ResolverRegistry.owner (EVM) transferred to a 2-of-3 multisig Red Currently the deploying EOA on testnet. Multisig migration is a Q4 2026 deliverable (ROADMAP.md §Q4).
Stellar equivalent governance role migrated to multisig Red Same timeline.
Multisig address committed to repo and verified on Etherscan + Stellar Expert Red Depends on multisig setup.
Slash beneficiary is not the deploying EOA Red On testnet the deploying address is the slash beneficiary; must change pre-mainnet (TRUST_MODEL.md).
DAO timelock + Governor contract deployed (v2.1 — optional for initial mainnet) Red Scoped to v2.1 (ROADMAP.md §Q2-Q3 2027); not required for initial mainnet launch, but must be on the public roadmap.

Green definition. ResolverRegistry.owner on both chains is a verifiable multisig address (≥ 2-of-3), slash beneficiary is not the deploying EOA, and addresses are committed to deployments.mainnet.json.

Yellow definition. Multisig created and tested on testnet; mainnet transfer not yet executed.

Red definition. Privileged roles still held by a single EOA.

Current status: Red.


Known blockers (summary)

The following items are the hard prerequisites that determine when any gate can turn Green. They are listed in dependency order.

# Blocker Blocks gate(s) Owner
B-1 Foundry fuzz + invariant suite complete and CI-gated Gate 1 (audit prerequisite) Engineering
B-2 EVM ↔ Soroban differential test wired into CI Gate 1 Engineering
B-3 Audit firm(s) contracted and capacity reserved for Q4 2026 Gate 1 Business dev
B-4 14-day Sepolia soak run executed and dashboard published Gate 2, Gate 3 Engineering / DevOps
B-5 ≥ 3 community resolvers onboarded to testnet Gate 4 Partnership / marketing
B-6 Resolver bootstrap grant pool approved Gate 4 Funding
B-7 Prometheus + Grafana stack deployed publicly Gate 5 Engineering
B-8 Coordinator Postgres migration and CDN/WAF in place Gate 5 Engineering / DevOps
B-9 Immunefi (or equivalent) programme configured and live Gate 6 Business dev
B-10 Multisig wallets created and ownership transferred Gate 7 Engineering / governance

No mainnet activation will proceed while any of B-1 through B-10 is open for a gate that has not yet reached Green.


Overall status

Gate Status
Gate 1 — Audit Red
Gate 2 — Testnet uptime / swap count Yellow
Gate 3 — Refund success Yellow
Gate 4 — Resolver participation Red
Gate 5 — Observability Red
Gate 6 — Bug bounty Red
Gate 7 — Governance / multisig Red

Mainnet is disabled. VITE_MAINNET_ENABLED is false in the production Vercel deployment. It will not be set to true until every gate above shows Green and the final checklist in docs/DEPLOYMENT.md is signed off.