Reword sensitivity analysis description of inflation costs during construction to characterize the min/max range for the min/max stimulation cost adjustment factors; previous description was using values for a single stimulation cost factor.
1 parent 58fb62a commit 35a0ae6

File tree

1 file changed

+1
-1
lines changed

1 file changed

+1
-1
lines changed

docs/Fervo_Project_Cape-4.md

Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -112,7 +112,7 @@ sensitivity analysis using [GEOPHIRES's Monte Carlo simulation module](Monte-Car
112112

113113
The following tables and heatmaps show Electricity breakeven price (LCOE) and NPV sensitivity to stimulation cost and inflation costs during construction (a proxy for construction delays and cost overruns).
114114
Stimulation costs were tested from $2.3M/well (Reservoir Stimulation Capital Cost Adjustment Factor = 0.5) to $9.2M/well (Reservoir Stimulation Capital Cost Adjustment Factor = 2).
115-
Construction inflation costs were tested from $53.58M (Inflation Rate During Construction = 2.3%) to $340.13M (Inflation Rate During Construction = 14.6%).
115+
Inflation Rate During Construction was tested from 2.3% to 14.6%, yielding construction inflation costs ranging from $53.6M to $459M.