Permute Q/K at conversion, use ggml_rope_ext #10
Triggered via pull request
July 1, 2026 00:46
Status
Failure
Total duration
1d 0h 0m 25s
Artifacts
–
Annotations
6 errors
|
ubuntu (arm64, ubuntu-24.04-arm)
Process completed with exit code 8.
|
|
ubuntu (x64, ubuntu-22.04)
The strategy configuration was canceled because "ubuntu.arm64_ubuntu-24_04-arm" failed
|
|
ubuntu (x64, ubuntu-22.04)
The operation was canceled.
|
|
windows (x64-cpu-static, x64, -G "Ninja Multi-Config" -D CMAKE_TOOLCHAIN_FILE=cmake/x64-windows-l...
Process completed with exit code 1.
|
|
windows (x64-vulkan, x64, -G "Ninja Multi-Config" -D CMAKE_TOOLCHAIN_FILE=cmake/x64-windows-llvm....
The strategy configuration was canceled because "windows.x64-cpu-static_x64_-G__Ni" failed
|
|
build-cmake-pkg / linux
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|