Skip to content
This repository was archived by the owner on May 12, 2026. It is now read-only.

chore: Finalize refactoring changes and compatibility layers #2

chore: Finalize refactoring changes and compatibility layers

chore: Finalize refactoring changes and compatibility layers #2

Triggered via push March 7, 2026 11:35
Status Failure
Total duration 23s
Artifacts 1

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
security
ERROR: Unexpected exit code [1]
test (3.10)
Process completed with exit code 2.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
Process completed with exit code 2.
test (3.9)
The strategy configuration was canceled because "test._3_10" failed
test (3.9)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_10" failed
test (3.8)
The operation was canceled.
type-check
Process completed with exit code 1.
lint
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size Digest
gitleaks-results.sarif Expired
6.65 KB
sha256:ee450096dbe4aa412e832928f75d6757f61d5ae3bfa85a74f528d1e60ddada6c