Skip to content
This repository was archived by the owner on May 12, 2026. It is now read-only.

chore: Finalize refactoring changes and compatibility layers #3

chore: Finalize refactoring changes and compatibility layers

chore: Finalize refactoring changes and compatibility layers #3

Triggered via push March 7, 2026 11:37
Status Failure
Total duration 29s
Artifacts 1

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
security
ERROR: Unexpected exit code [1]
test (3.11)
Process completed with exit code 2.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
Process completed with exit code 2.
test (3.9)
The strategy configuration was canceled because "test._3_11" failed
test (3.9)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_11" failed
test (3.8)
The operation was canceled.
type-check
Process completed with exit code 1.
lint
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size Digest
gitleaks-results.sarif Expired
6.65 KB
sha256:5e64a8fcc2c3715ff69dc1155479d72ee2724108cee943cf326d7fa6a82bb857