Skip to content

Merge pull request #144 from colossus-credit/dev #157

Merge pull request #144 from colossus-credit/dev

Merge pull request #144 from colossus-credit/dev #157

Triggered via push October 17, 2025 15:53
Status Failure
Total duration 33s
Artifacts

test.yml

on: push
Matrix: codespell
Matrix: Forge Testing
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Forge Testing (min-solc)
Process completed with exit code 1.
Forge Testing (post-prague-via-ir)
The strategy configuration was canceled because "tests.min-solc" failed
Forge Testing (post-prague-via-ir)
The operation was canceled.
Forge Testing (post-prague)
The strategy configuration was canceled because "tests.min-solc" failed
Forge Testing (post-prague)
The operation was canceled.
Forge Testing (via-ir)
The strategy configuration was canceled because "tests.min-solc" failed
Forge Testing (via-ir)
The operation was canceled.
Forge Testing (min-solc-via-ir)
The strategy configuration was canceled because "tests.min-solc" failed
Forge Testing (min-solc-via-ir)
The operation was canceled.