Skip to content

Pull requests: NVIDIA/k8s-test-infra

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

perf(e2e): cap the NRI workload grace period to unblock pod teardown
#686 opened Aug 19, 2026 by giuliocalzo Collaborator Loading…
6 tasks done
feat(mocknvml): decode GPU fabric health for nvidia-smi -q kind/feature Feature request or enhancement.
#685 opened Aug 19, 2026 by giuliocalzo Collaborator Draft
6 of 7 tasks
feat(mocknvml): model SRAM ECC errors and row-remap availability kind/feature Feature request or enhancement.
#684 opened Aug 19, 2026 by giuliocalzo Collaborator Loading…
6 tasks done
fix(local): pin kind worker node names and select the fleet by hostname kind/feature Feature request or enhancement.
#683 opened Aug 19, 2026 by giuliocalzo Collaborator Loading…
6 of 7 tasks
feat(nvml-mock): serve the rendered PCI sysfs tree and a DMI identity to Go consumers kind/feature Feature request or enhancement.
#674 opened Aug 18, 2026 by giuliocalzo Collaborator Loading…
MEP0003: Mokka Node Agent kind/mep Mokka Enhancement Proposal (see enhancements/README.md).
#670 opened Aug 18, 2026 by roma-glushko Member Loading…
1 of 6 tasks
docs(demo): pin the kube context in the demo READMEs and the two scripts that still omit it priority/p1 P1: works but not as documented; small impact; workaround exists. Max fix SLA: 6 months.
#576 opened Aug 2, 2026 by LuisMend12 Loading…
3 tasks done
v0.4.0
poc: Mokka + AICR pre-silicon integration preflight backlog Not scheduled for a release. Revisit at each milestone close. priority/p1 P1: works but not as documented; small impact; workaround exists. Max fix SLA: 6 months.
#503 opened Jul 25, 2026 by ArangoGutierrez Collaborator Draft
ci: add self-managing repository automation backlog Not scheduled for a release. Revisit at each milestone close. priority/p2 P2: minor defect or perf implication. No fix-time commitment.
#474 opened Jul 17, 2026 by ArangoGutierrez Collaborator Loading…
test(e2e): Kata Containers E2E lane (v1 plain Kata) backlog Not scheduled for a release. Revisit at each milestone close. priority/p2 P2: minor defect or perf implication. No fix-time commitment.
#450 opened Jul 9, 2026 by ArangoGutierrez Collaborator Loading…
ProTip! Type g p on any issue or pull request to go back to the pull request listing page.