Skip to content

Remove default timestep/daily meters#5528

Merged
DavidGoldwasser merged 1 commit into
developfrom
remove_timestep_daily_meters
Nov 24, 2025
Merged

Remove default timestep/daily meters#5528
DavidGoldwasser merged 1 commit into
developfrom
remove_timestep_daily_meters

Conversation

@shorowit

Copy link
Copy Markdown
Contributor

Pull request overview

Pull Request Author

  • Model API Changes / Additions
  • Any new or modified fields have been implemented in the EnergyPlus ForwardTranslator (and ReverseTranslator as appropriate)
  • Model API methods are tested (in src/model/test)
  • EnergyPlus ForwardTranslator Tests (in src/energyplus/Test)
  • If a new object or method, added a test in NREL/OpenStudio-resources: Add Link
  • If needed, added VersionTranslation rules for the objects (src/osversion/VersionTranslator.cpp)
  • Verified that C# bindings built fine on Windows, partial classes used as needed, etc.
  • All new and existing tests passes
  • If methods have been deprecated, update rest of code to use the new methods

Labels:

  • If change to an IDD file, add the label IDDChange
  • If breaking existing API, add the label APIChange
  • If deemed ready, add label Pull Request - Ready for CI so that CI builds your PR

Review Checklist

This will not be exhaustively relevant to every PR.

  • Perform a Code Review on GitHub
  • Code Style, strip trailing whitespace, etc.
  • All related changes have been implemented: model changes, model tests, FT changes, FT tests, VersionTranslation, OS App
  • Labeling is ok
  • If defect, verify by running develop branch and reproducing defect, then running PR and reproducing fix
  • If feature, test running new feature, try creative ways to break it
  • CI status: all green or justified

@shorowit shorowit self-assigned this Nov 18, 2025
@shorowit shorowit added the Pull Request - Ready for CI This pull request if finalized and is ready for continuous integration verification prior to merge. label Nov 18, 2025
@ci-commercialbuildings

ci-commercialbuildings commented Nov 18, 2025

Copy link
Copy Markdown
Collaborator

@shorowit shorowit marked this pull request as ready for review November 18, 2025 19:21
@shorowit shorowit changed the title Remove timestep/daily meters Remove default timestep/daily meters Nov 18, 2025
@shorowit shorowit added this to the OpenStudio SDK 3.11.0 milestone Nov 18, 2025
@shorowit

Copy link
Copy Markdown
Contributor Author

Verified the meters don't show up in the IDF (see before vs after below).

image

@jmarrec jmarrec left a comment

Copy link
Copy Markdown
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I'm all fine if we want to remove that bit, and even the rest around it.

Just need to make sure @DavidGoldwasser has updated the openstudio_results measure to ensure the outputs needed are added by the measure itself.

@shorowit

Copy link
Copy Markdown
Contributor Author

I'm all fine if we want to remove that bit, and even the rest around it.

Yeah, I can tell. 😆

I’m also in favor of removing more, but started with the more important stuff.

@DavidGoldwasser DavidGoldwasser left a comment

Copy link
Copy Markdown
Collaborator

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

I think this is fine. If it breaks a measure, we can add that output request to the measure.

@DavidGoldwasser DavidGoldwasser merged commit c868425 into develop Nov 24, 2025
4 of 6 checks passed
@joseph-robertson joseph-robertson deleted the remove_timestep_daily_meters branch November 24, 2025 23:05
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Pull Request - Ready for CI This pull request if finalized and is ready for continuous integration verification prior to merge.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

OS Workflow should not request outputs, especially timestep, by default

4 participants