[SplitLogicalObjFifo] Fix split-logicalobjfifo pass to analyse unique producers/consumers ObjFifos #2196
ci-linux.yml
on: pull_request
Matrix: Build and Test (linux)
Matrix: E2E Test Linux Phoenix
Matrix: E2E Test Linux Strix
Annotations
6 errors
Build and Test (linux) (OFF)
Process completed with exit code 2.
|
Build and Test (linux) (OFF)
Process completed with exit code 1.
|
Build and Test (linux) (ON)
The job was canceled because "OFF" failed.
|
Build and Test (linux) (ON)
The operation was canceled.
|
Build and Test (linux) (ON)
Process completed with exit code 1.
|
Build and Test (linux) (ON)
Process completed with exit code 2.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
linux_x86_64_iree_packages_asserts=OFF
|
179 Bytes |
|
linux_x86_64_llvm_packages_asserts=OFF
|
420 MB |
|