🚀 CPM Analyzer & Network Grapher

HTML5 CSS3 JavaScript Vis.js Industrial Engineering

CPM Analyzer is an interactive Decision Support System (DSS) developed based on project management and Operations Research principles. By analyzing the durations and dependencies of user-inputted activities, it calculates the project's Critical Path and visualizes the results on the screen according to Graph Theory rules.

🔗 Explore Live Simulation (Live Demo)

📊 Mathematical Background & Methodology

This tool uses a custom JavaScript algorithm in the background to solve complex network topologies. The system follows these stages:

  1. Forward Pass: Calculates the Earliest Start (ES) and Earliest Finish (EF) times for each activity to determine the minimum project completion time.
  2. Backward Pass: Moves from the end to the beginning of the network to find the Latest Start (LS) and Latest Finish (LF) times.
  3. Slack Calculation: Determines the delay tolerances of the activities. Nodes with a slack value of 0 are considered on the Critical Path.
  4. Cyclic Graph Protection: The algorithm prevents the user from accidentally entering predecessors that create an infinite loop (e.g., A -> B and B -> A).

🌟 Highlighted Features

  • Dynamic Data Entry: Any number of activities (Nodes) can be added, and duration and predecessor dependencies can be dynamically defined.
  • Custom SVG Node Engine: Using the industry-standard Vis.js library, custom vector (SVG) boxes are generated for each node. These boxes contain the ES, EF, LS, and LF values in the 4 corners of the activity, perfectly mirroring academic textbooks.
  • Visual Critical Path Map: The critical path that creates the project's bottleneck is automatically highlighted with red arrows (Edges) and red nodes on the interactive network map.
  • Auto-Fit and Pan-Zoom: In large-scale projects, the network map automatically fits the screen constraints (Auto-fit), and the user can navigate or zoom the map smoothly.
  • Detailed Analysis Table: All calculated values are formatted into a readable matrix table.

⚙️ Installation and Usage

The project runs 100% "Client-Side". No server installation or backend configuration is required.

  1. Clone the repository to your local machine:
    git clone [https://github.com/onurfgg/BU_KISMA_REPO_ADINI_YAZ.git](https://github.com/onurfgg/critical-path-dashboard.git)
    
    

Onur Furkan Gök

Linkedin GitHub

About

A dynamic Critical Path Method (CPM) dashboard based on Industrial Engineering principles. It resolves activity dependencies, identifies the critical path, and interactively visualizes network topology (ES, EF, LS, LF) using Vis.js.