You can look at the Project Calendar to see the upcoming list of tasks.
| Contributor | Previous Week | This Week | Issues For Group | |
|---|---|---|---|---|
| Elizabeth | Examined validation run output and reviewed reports. | Finalize all final deliverables. | ||
| Lisa | Out of town |
| ||
| Greg | ||||
| Renee |
|
|
||
| Dan |
|
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa |
|
Out of town. | |
| Greg | |||
| Renee |
|
|
|
| Dan |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa |
|
|
|
| Greg | |||
| Renee |
|
|
|
| Dan |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa | Count Dracula updates (UI, upload UI, updating counts) |
|
|
| Greg | |||
| Renee |
|
|
|
| Dan |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa |
|
Count Dracula updates (UI, upload UI, updating counts) | |
| Greg | |||
| Renee |
|
|
|
| Dan |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa |
|
||
| Greg | |||
| Renee |
|
|
|
| Dan |
|
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa | |||
| Greg | |||
| Renee |
|
|
|
| Dan | Reviewed results of both JHC 2012 SF CHAMP scenarios in preparation for DTA Anyway scenario testing runs. |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa | Issue 149: Push Count Dracula to Tehama | ||
| Greg | |||
| Renee |
|
|
|
| Dan |
|
Reviewed results of both JHC 2012 SF CHAMP scenarios in preparation for DTA Anyway scenario testing runs. |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
|
|
| Lisa | Count Dracula work, Fixed Issue 134 Custom Priorities for two-way stops | Issue 149: Push Count Dracula to Tehama; Work on Issue 111: Transit Lanes split for right turns | |
| Greg |
|
||
| Renee |
|
|
|
| Dan | Started model runs v6 and v8 |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
|
|
| Lisa | Count Dracula work | Count Dracula work, Fixed Issue 134 Custom Priorities for two-way stops | |
| Greg | |||
| Renee |
|
|
|
| Dan | Continued validation runs on ResetSpeedFlow v4 and v5 to 130 iterations. | Prepare four additional validation runs to test changes to effective PCU length, follow-up time, gap acceptance, and the general cost expression (by adding a distance function) | Need to split model runs between SFCTA and PB computing resources. |
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Check on Peer Review Panel Report | Read Peer Review Panel Report draft ASAP | |
| Lisa | Count Dracula work | Count Dracula work | |
| Greg | |||
| Renee |
|
|
|
| Dan | Began testing revised traffic parameter settings in validation run series titled "ResetSpeedFlow" | Continued revised traffic parameter settings validation runs. | |
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Check on Peer Review Panel Report | ||
| Lisa | Count Dracula work | Count Dracula work | |
| Greg | |||
| Renee |
|
|
|
| Dan |
|
|
|
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth |
|
||
| Lisa | Started work on Count Dracula update to GeoDjango | Continuing work on CountDracula update | |
| Greg | |||
| Renee |
|
|
|
| Dan | Started Annie on standardizing additional validation counts | Conduct speed-flow parameter sensitivity tests | |
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Wrote and sent progress report. | ||
| Lisa | Completed custom priorities implementation for Issue 137: Two way stop control for centroid connectors | Started work on CountDracula update to GeoDjango | |
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan |
|
|
|
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Progress report and code reviews. | ||
| Lisa | Completed custom priorities implementation for Issue 137: Two way stop control for centroid connectors | ||
| Neema | |||
| Greg |
|
|
|
| Renee |
|
|
|
| Dan |
|
|
|
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Vacation. | ||
| Lisa |
|
||
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan |
|
||
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Vacation. | ||
| Lisa |
|
||
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | |||
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Peer Review! | Turn peer review items into actions. | |
| Lisa | Peer review: code base presentation | Started looking into counts | |
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | |||
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | Read and approve all peer review materials | ||
| Lisa | Peer review: code base presentation | ||
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | |||
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Elizabeth | |||
| Lisa | |||
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | |||
| Jim |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | |||
| Elizabeth | |||
| Lisa | Quick stop sign update: mark as all-way stops if facility type ambiguity exists for two-way stops. Generalize the way that the user specifies which links not to split. | Issue 109 Count Trends across years. Start Issue 113: Import GTFS to DTA | |
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | Analyzed resulting data and used findings to adjust DTA model settings |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | |||
| Elizabeth | |||
| Lisa | Fix for Issue 93: Investigate duplicate/mismatched counts in Count Dracula output. Issue 96: Documentation for DTA Anyway. Issue 95: SF-CHAMP Overview of LOS Inputs | Quick stop sign update: mark as all-way stops if facility type ambiguity exists for two-way stops. Generalize the way that the user specifies which links not to split. | |
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | Conducted speed, flow, queue, and response time surveys. Surveys were conducted at 9 locations in San Francisco featuring various street grades. | Analyzed resulting data and used findings to adjust DTA model settings. |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
||
| Elizabeth |
|
|
|
| Lisa | Code review/cleanup for unsignalized intersections (Issue 35). More data collection. | Fix for Issue 93: Investigate duplicate/mismatched counts in Count Dracula output. Issue 96: Documentation for DTA Anyway. Issue 95: SF-CHAMP Overview of LOS Inputs | |
| Neema | |||
| Greg | |||
| Renee |
|
|
|
| Dan | Started work on turn prohibition review related to feedback from SFMTA on turn penalty map | Conducted speed, flow, queue, and response time surveys. Surveys were conducted at 9 locations in San Francisco featuring various street grades. |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa | Fix Issue 83: Implement transit lanes and Issue 68: Add date/time args to count dracula. Code cleanup - reuse orientation code rather. Data collection for response times/jam density. Worked on some signals. | Code review/cleanup for unsignalized intersections (Issue 35). More data collection. Get calibration runs going. | |
| Neema | |||
| Greg |
|
|
|
| Renee |
|
|
|
| Dan | Away | Started work on turn prohibition review related to feedback from SFMTA on turn penalty map | Conduct speed, flow, queue, and response time surveys |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
D | |
| Lisa | Fix Issue 78 Transit import should verify that all required movements are allowed for transit and Issue 79 Links are too short for buses | Fix Issue 83: Implement transit lanes and Issue 68: Add date/time args to count dracula. Code cleanup - reuse orientation code rather. Data collection for response times/jam density. Worked on some signals. | |
| Neema | |||
| Greg | |||
| Renee |
|
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | Nothing important | Do some vaidation plots | |
| Elizabeth |
|
Develop new list of things to do based on Validation Run 1! | QA/QC in dynameq please! |
| Lisa | Fixed Issue 74 and Issue 76 | Fix Issue 78 Transit import should verify that all required movements are allowed for transit and Issue 79 Links are too short for buses | |
| Neema | |||
| Greg | |||
| Renee |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | |||
| Elizabeth | Finalized peer review dates and panel | Code Movements and give to group | |
| Lisa | |||
| Neema | |||
| Greg | |||
| Renee |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | Created a histogram plot for the demand. Coded bucket rounding | Investigated the error caused by matrix rounding. Differences in row and column sums can be as much as 40 trips | |
| Elizabeth | FT | QA/QC needs to happen on some level before you mark an issue complete | |
| Lisa |
|
|
|
| Dan | |||
| Greg | |||
| Renee |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | Fixed external centroid placement. Calculated number of lanes correctly for the external connectors | Created a histogram plot for the demand. Coded bucket rounding | |
| Elizabeth | nada | FT | QA/QC needs to happen on some level before you mark an issue complete |
| Lisa | Cleanup/code review of Transit import scripts and related classes |
|
|
| Dan | |||
| Greg | |||
| Renee |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | Calculated capacities for protected movements at signalized intersections. Added capacity information to corridor plot | Fixed external centroid placement. Calculated number of lanes correctly for the external connectors | |
| Elizabeth | Unfortunately not much. | ||
| Lisa | Cleanup/code review of Transit import scripts and related classes | ||
| Dan | |||
| Greg | |||
| Renee |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
Calculated capacities for protected movements at signalized intersections. Added capacity information to corridor plot | |
| Elizabeth |
|
|
|
| Lisa | |||
| Dan | |||
| Greg | |||
| Renee |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
code review for signal code | |
| Lisa | |||
| Dan | |||
| Greg | |||
| Renee |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa | |||
| Dan | |||
| Greg | |||
| Renee |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis | |||
| Elizabeth |
|
|
|
| Lisa | Fixed Issue 59: Make sure CountDracula works with DTAAnyway and worked on Issue 62: Import counts to CountDracula | ||
| Dan |
|
|
|
| Greg | |||
| Renee |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
||
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
||
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
||
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
|
| Dan |
|
|
|
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
|
| Dan |
|
|
|---|
| Greg |
|
|---|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
||
| Lisa |
|
||
| Dan |
|
|
|
| Greg |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa |
|
||
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa |
|
||
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa |
|
||
| Dan |
|
||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa | |||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa | |||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa | |||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa |
|
||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
||
| Lisa | |||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | |||
| Lisa | |||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth | figure out how to get Dan involved. | ||
| Lisa | |||
| Dan | |||
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
figure out how to get Dan involved. | |
| Lisa | |||
| Dan | Get acquainted with the project | ||
| Greg |
|
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa | |||
| Greg | |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
|
|
| Elizabeth |
|
|
|
| Lisa |
|
Interviewed DTA intern candidates. | |
| Greg |
| Contributor | Previous Week | This Week | Issues For Group |
|---|---|---|---|
| Michalis |
|
||
| Varun |
|
Varun finished up at the end of last week |
|
| Elizabeth |
|
|
|
| Lisa |
|
|
Varun Added CountDracula-based count importing
Elizabeth and Lisa Code-reviewed CountDracula first cut
Elizabeth Received and Plugged in the Dynameq Size 10 license WOOHOO
Lisa Implemented
Network.insertVirtualNodeBetweenCentroidsAndRoadNodes(), uploaded small test networks. Full San Francisco network is viewable in Dynameq (although lacking in lots of attributes, of course).Michalis Review Lisa's Code
Lisa: DTA networks can now have shifts and shape points; implemented beginning of CubeNetwork read methods
Elizabeth Installed 64-bit Dynameq 2.5 test on FOLSOM.
Got Michalis' VPN working again so he can remote access our license. Still having a bit of trouble with the VNC portion.
Lisa: Continuing to read/write Dynameq and Cube networks; goal is to get something by end of week
Michalis & Elizabeth: Wednesday and Friday code review
Lisa: Working on code to read/write Dynameq and Cube networks.
Michalis: Discuss progress by phone
Lisa: Branched dev and created some stub files. Talked to Michalis about the plan and timeline, decided that I would convert the existing code to the new dta module in order to:
- read and write the geary dynameq network
- read the cube network and write the dynameq network
The goal is to get this working by July 1; Michalis would then assist with the merge portion. Also discussed plan of action for the new intern, Varun, who will be assisting with getting counts infrastructure into place.
Elizabeth
Last Week:
- There were a lot of contract and task order hoops that had to be jumped through on the TA side of things...but I think things are on the way to getting a TO to PB by the end of the week or beginning of next with an NTP
- Decided on a DTA intern
- Followed up with Inro about software licensing. We will have a version of Dynameq in our hands that can accept the entire network by the 2nd week of July. Until then, we can focus on getting the data ready and developing the script infrastructure. The Inro purchase order should be out the door.
Next Week:
- I will be on vacation.
Issues for Group:
Elizabeth
Last Week:
- Updated scope, schedule and budget and sent to PB to review this will be for both a contract amendment with FHWA as well as the PB task order
- Interviewed potential DTA interns
- Had discussions with Inro about software licensing needed for this project as well as software versions
This Week:
- Finalize scope and get task order to PB
- Hire a DTA intern
- Get purchase order out to Inro
Issues for Group:
- Need to make sure everybody has the hours I said they did in the scope and schedule.
Lisa
Last Week:
- Updated wiki to provide more detail for each task
- Researched GPL licensing
This Week:
- Draft a licensing memo/wiki page
- Draft a code base structure
- Draft and potentially test a workflow
Issues for Group:
- Need to discuss GPL licensing issues
- Need to discuss dependency issues/software requirements, etc.
- Need to test workflow
Billy
- Reviewed site hosting options (looked at sourceforge, google code, github, gitorious.) Chose Google Code!
- Note: Google Code doesn't support GIT, our internal code repository, but does support Subversion and Mercurial. I vote for Subversion since Git talks to it fluently. In my opinion Mercurial is a vestigial system that is being superseded by Git in the marketplace.
- Note: Google Code doesn't support GIT, our internal code repository, but does support Subversion and Mercurial. I vote for Subversion since Git talks to it fluently. In my opinion Mercurial is a vestigial system that is being superseded by Git in the marketplace.
- Created initial project web pages for landing frontpage, initial task wiki pages, and project statuses.
- Created internal mailing list for the project team, [email protected]. All team members can have access to it from http://groups.google.com/group/dta-discuss?hl=en -- let's discuss who wants to be on it?