Skip to content

Pull requests: tikv/pd

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

tso: make tso log more clear dco-signoff: yes Indicates the PR's author has signed the dco. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#8826 opened Nov 20, 2024 by okJiang Review required
scheduler: speed up exit needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note Denotes a PR that will be considered when it comes time to generate release notes.
#5341 opened Jul 21, 2022 by han-ian Review required
*: normalize error according errdoc-gen needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files. status/LGT1 Indicates that a PR has LGTM 1.
#7114 opened Sep 19, 2023 by lhy1024 Review required
ratelimit: apply BBR in limiter needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#7277 opened Oct 26, 2023 by CabinfeverB Review required
client/http: support tidb-operator SDK needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#7508 opened Dec 7, 2023 by HuSharp Approved
client: print more info when leader disconnect release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#7907 opened Mar 12, 2024 by CabinfeverB Approved
[DNM]add log dco-signoff: yes Indicates the PR's author has signed the dco. do-not-merge/needs-linked-issue release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#8446 opened Jul 26, 2024 by lance6716 Approved
[WIP] *: GC API Refactorying dco-signoff: yes Indicates the PR's author has signed the dco. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#8989 opened Jan 10, 2025 by MyonKeminta Draft
tools: implement the pd-region-bench tool component/tools Tools. dco-signoff: yes Indicates the PR's author has signed the dco. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#9087 opened Feb 20, 2025 by JmPotato Review required
scheduler: use store leaders sum instead of hot leaders sum do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note.
#3962 opened Aug 11, 2021 by HunDunDM Draft
server:return qps data to tidbdashborad do-not-merge/needs-linked-issue needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note.
#4921 opened May 11, 2022 by qidi1 Review required
server:add querystats sync to follower pd do-not-merge/needs-linked-issue needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note.
#4922 opened May 11, 2022 by qidi1 Approved
[WIP] *: use pdqsort to improve sort performance do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note Denotes a PR that will be considered when it comes time to generate release notes.
#4983 opened May 18, 2022 by hawkingrei Loading…
update store leader count hideZero is false do-not-merge/needs-linked-issue release-note Denotes a PR that will be considered when it comes time to generate release notes. status/LGT1 Indicates that a PR has LGTM 1.
#5263 opened Jul 4, 2022 by glkappe Loading…
schedule/placement/fit: cache the match info for rules to peers needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note.
#5277 opened Jul 6, 2022 by AndreMouche Loading…
balance_region: remove the unnecessary retry when try to pick a region to transfer do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note.
#5398 opened Aug 4, 2022 by AndreMouche Draft
schedulers: opt balance witness when store nr larger than peer nr needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note.
#6149 opened Mar 12, 2023 by ethercflow Loading…
mcs, tso: create global tso state view and apply to discovery, monitoring, etc. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6525 opened May 25, 2023 by binshi-bing Draft
Improve TSO proxy based on the existing TSO Follower Batching framework do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. status/LGT1 Indicates that a PR has LGTM 1.
#6565 opened Jun 7, 2023 by binshi-bing Draft
*: limit region count do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#7100 opened Sep 14, 2023 by overvenus Draft
[DNM] mcs: refine delete resource group logic to avoid corner case of tiflash do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
#7191 opened Oct 11, 2023 by guo-shaoge Loading…
rate_limit: add metrics needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/XXL Denotes a PR that changes 1000+ lines, ignoring generated files.
#7343 opened Nov 9, 2023 by CabinfeverB Loading…
election: fix the PD leader switch when etcd leader fake unchanged component/election Election related logic. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. release-note-none Denotes a PR that doesn't merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#7846 opened Feb 22, 2024 by JmPotato Loading…
client: remote var leader which is the same as forwardedHost needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.
#7965 opened Mar 21, 2024 by CabinfeverB Loading…
scheduler: add metrics when there is potential reverse dco-signoff: yes Indicates the PR's author has signed the dco. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#8741 opened Oct 23, 2024 by lhy1024 Loading…
ProTip! Adding no:label will show everything without a label.